Rumuokoro Garden Court current site
← Back to the development map
Demonstration ProjectFoundation Stage

Watch this community come to life.

Follow every stage—from the original land and site preparation to infrastructure, construction, finishing and completed homes.

Rumuokoro Garden Court

Rumuokoro, Port Harcourt, Rivers State

34%
Verified completion
343
Days since project start
Q1 2028
Estimated completion
64
Verified members

Latest verified update: Pile caps completed on Block 1, verified 5 June 2026.

The story so far

Before, current and future vision

Original land parcel before acquisition.Before

Original land parcel before acquisition.

Captured 19 August 2025

Foundation and substructure works.Current

Foundation and substructure works.

Inspected 5 June 2026 · Verified by Ibrahim Sule, Structural Engineer

Approved concept visualisation of the courtyard blocks.Future VisionArchitectural Visualisation

Approved concept visualisation of the courtyard blocks.

Approved Concept Visualisation

This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.

Compare

Drag to compare the land over time

Current Progress — 5 June 2026
Original Site — 19 August 2025
Original Site — 19 August 2025Current Progress — 5 June 2026
Approved Concept VisualisationArchitectural Visualisation
Current Progress — 5 June 2026
Current Progress — 5 June 2026Approved Concept Visualisation

This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.

Construction timeline

Every stage, with dates and status

Government Approval illustration

Stage 7 of 19

Government Approval

Government Approval for this demonstration project, recorded against approved project records.

Planned 15 January 2025

Ibrahim Sule, Structural Engineer

Masterplan

Units, plots and estate layout

1-2A1-3BIndicative layout — boundaries not published

Land boundary, blocks, roads, drainage, utilities, green areas and community facilities are shown to verified members where publication has been approved.

1-2A · 2-bed apartment

2 bedrooms · 96 sqm · Foundation

Available

Contribution from ₦28,000,000 · Estimated completion Q1 2028

1-3B · 3-bed apartment

3 bedrooms · 128 sqm · Foundation

Reserved

Contribution from ₦37,500,000 · Estimated completion Q1 2028

Development gallery

Photographs, drone images and renderings

Original land parcel before acquisition.Drone photograph

Original land parcel before acquisition.

Original Land · 19 August 2025 · Uploaded by project administrator · Verification: approved

Foundation and substructure works.Photograph

Foundation and substructure works.

Original Land · 5 June 2026 · Uploaded by project administrator · Verification: approved

Approved concept visualisation of the courtyard blocks.Architectural rendering

Approved concept visualisation of the courtyard blocks.

Original Land · Concept · Uploaded by project administrator · Verification: approved

Only approved media is published. Unapproved construction media stays with the project team until a professional reviewer verifies it.

Understand the Land

Terrain story

Terrain reference view

Satellite and terrain reference

Flat · Urban

Terrain classification
Flat urban land
Elevation summary
Approx. 12–15m above sea level (record)
Slope summary
Level site
Existing vegetation
Cleared
Access route
Direct frontage on a tarred city road
Drainage observations
Connects to municipal drainage
Nearby water bodies
None recorded within 3km
Surrounding land use
Mixed residential and commercial
Soil / geotechnical report
Available to verified members
Flood-risk report
Available to verified members
Survey status
Completed

Terrain and environmental information is provided from available project records. Prospective members should review the verified survey, geotechnical, environmental and legal reports before making a commitment.

Infrastructure

What is being installed on this site

  • Internal roadsInstallation Started
  • DrainageProcurement
  • Water supplyProcurement
  • BoreholesApproved
  • Water treatmentInstallation Started
  • SewageProcurement
  • ElectricityProcurement
  • TransformersApproved
  • Solar energyInstallation Started
  • Street lightingProcurement
  • CCTVProcurement
  • Access controlApproved
  • Internet infrastructureInstallation Started
  • Waste collectionProcurement
  • Fire protectionProcurement
  • LandscapingApproved
  • Community facilitiesInstallation Started

Our Community Vision

The community dream board

Courtyard garden

Proposed community feature.

Playground

Proposed community feature.

Backup power

Proposed community feature.

Parking

Proposed community feature.

Security

Proposed community feature.

Gym

Proposed community feature.

Construction updates

Verified progress stories

Site Clearing Has Begun

18 February 2026 · Site Preparation

Site Clearing Has Begun

Approved contractors began clearing and setting out under supervision of the project surveyor.

16% → 24% verified

Next: Drainage channels and access road formation.

Drainage Channels Are Taking Shape

9 April 2026 · Roads and Drainage

Drainage Channels Are Taking Shape

Primary drainage runs excavated and lined along the estate spine road.

24% → 30% verified

Next: Foundation setting out for the first residential block.

Foundation Progress Verified

2 July 2026 · Foundation

Foundation Progress Verified

Independent project manager inspected the works and verified the recorded completion percentage.

30% → 34% verified

Next: Continue approved works programme.

Project progress

Where this development stands

Overall development progress34%
Land acquisition64%
Documentation58%
Design54%
Approvals49%
Infrastructure28%
Construction34%
Allocation4%
Handover0%
Original target date
Q1 2028
Current forecast
Q1 2028
Latest verified milestone
Design
Next milestone
Site Preparation
Starting contribution
₦28.0m
Units available
21

Member-only information

  • Detailed masterplan and boundary data
  • Construction and contractor reports
  • Financial reports and payment progress
  • Meeting decisions and internal announcements
  • Detailed risk register

Private landowner details, sensitive title numbers, member identities, bank details and security-system locations are never published.

Read our trust standards

64 verified members are following this development

Follow this development