Demonstration ProjectStructural Construction

Watch this community come to life.

Follow every stage—from the original land and site preparation to infrastructure, construction, finishing and completed homes.

Kubwa Heights Terraces

Kubwa, Abuja, Abuja (FCT)

58%
Verified completion
577
Days since project start
Q3 2027
Estimated completion
71
Verified members

Latest verified update: Second floor slab cast on Blocks A and B, verified 2 July 2026.

The story so far

Before, current and future vision

Original land — open grassland with a laterite access track.Before

Original land — open grassland with a laterite access track.

Captured 14 February 2025

Structural construction on Blocks A–C.Current

Structural construction on Blocks A–C.

Inspected 2 July 2026 · Verified by Ngozi Adeyemi, Project Manager (COREN)

Approved concept visualisation of the completed community.Future VisionArchitectural Visualisation

Approved concept visualisation of the completed community.

Approved Concept Visualisation

This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.

Compare

Drag to compare the land over time

Current Progress — 2 July 2026
Original Site — 14 February 2025
Original Site — 14 February 2025Current Progress — 2 July 2026
Approved Concept VisualisationArchitectural Visualisation
Current Progress — 2 July 2026
Current Progress — 2 July 2026Approved Concept Visualisation

This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.

Construction timeline

Every stage, with dates and status

Roofing illustration

Stage 12 of 19

Roofing

Roofing for this demonstration project, recorded against approved project records.

Planned 15 November 2026

Ngozi Adeyemi, Project Manager

Masterplan

Units, plots and estate layout

A-01A-02B-04C-07Indicative layout — boundaries not published

Land boundary, blocks, roads, drainage, utilities, green areas and community facilities are shown to verified members where publication has been approved.

A-01 · 3-bed terrace

3 bedrooms · 180 sqm · Structural

Allocated

Contribution from ₦42,000,000 · Estimated completion Q3 2027

A-02 · 3-bed terrace

3 bedrooms · 180 sqm · Structural

Available

Contribution from ₦42,000,000 · Estimated completion Q3 2027

B-04 · 4-bed terrace

4 bedrooms · 220 sqm · Foundation

Reserved

Contribution from ₦56,000,000 · Estimated completion Q4 2027

C-07 · 4-bed terrace

4 bedrooms · 220 sqm · Foundation

Available

Contribution from ₦56,000,000 · Estimated completion Q4 2027

Development gallery

Photographs, drone images and renderings

Original land — open grassland with a laterite access track.Drone photograph

Original land — open grassland with a laterite access track.

Original Land · 14 February 2025 · Uploaded by project administrator · Verification: approved

Structural construction on Blocks A–C.Photograph

Structural construction on Blocks A–C.

Original Land · 2 July 2026 · Uploaded by project administrator · Verification: approved

Approved concept visualisation of the completed community.Architectural rendering

Approved concept visualisation of the completed community.

Original Land · Concept · Uploaded by project administrator · Verification: approved

Only approved media is published. Unapproved construction media stays with the project team until a professional reviewer verifies it.

Understand the Land

Terrain story

Terrain reference view

Satellite and terrain reference

Gently Sloping · Suburban · Terrain Report Available

Terrain classification
Gently sloping suburban land
Elevation summary
Approx. 480–505m above sea level (record)
Slope summary
2–5% fall towards the north-east boundary
Existing vegetation
Grassland with scattered shrubs
Access route
Tarred road 800m from the site entrance
Drainage observations
Natural fall to a seasonal channel off-site
Nearby water bodies
Seasonal stream, 1.2km north
Surrounding land use
Residential estates and small retail
Soil / geotechnical report
Available to verified members
Flood-risk report
Not yet uploaded
Survey status
Perimeter survey completed and filed

Terrain and environmental information is provided from available project records. Prospective members should review the verified survey, geotechnical, environmental and legal reports before making a commitment.

Infrastructure

What is being installed on this site

  • Internal roadsInstallation Complete
  • DrainageInstallation Started
  • Water supplyInstallation Started
  • BoreholesProcurement
  • Water treatmentInstallation Complete
  • SewageInstallation Started
  • ElectricityInstallation Started
  • TransformersProcurement
  • Solar energyInstallation Complete
  • Street lightingInstallation Started
  • CCTVInstallation Started
  • Access controlProcurement
  • Internet infrastructureInstallation Complete
  • Waste collectionInstallation Started
  • Fire protectionInstallation Started
  • LandscapingProcurement
  • Community facilitiesInstallation Complete

Our Community Vision

The community dream board

Home designs

Proposed community feature.

Landscaping

Proposed community feature.

Playground

Proposed community feature.

Walkways

Proposed community feature.

Community centre

Proposed community feature.

Security posts

Proposed community feature.

Neighbourhood shops

Proposed community feature.

Shared workspace

Proposed community feature.

Construction updates

Verified progress stories

Site Clearing Has Begun

18 February 2026 · Site Preparation

Site Clearing Has Begun

Approved contractors began clearing and setting out under supervision of the project surveyor.

40% → 48% verified

Next: Drainage channels and access road formation.

Drainage Channels Are Taking Shape

9 April 2026 · Roads and Drainage

Drainage Channels Are Taking Shape

Primary drainage runs excavated and lined along the estate spine road.

48% → 54% verified

Next: Foundation setting out for the first residential block.

Structural Construction Progress Verified

2 July 2026 · Structural Construction

Structural Construction Progress Verified

Independent project manager inspected the works and verified the recorded completion percentage.

54% → 58% verified

Next: Continue approved works programme.

Project progress

Where this development stands

Overall development progress58%
Land acquisition88%
Documentation82%
Design78%
Approvals73%
Infrastructure52%
Construction58%
Allocation28%
Handover13%
Original target date
Q3 2027
Current forecast
Q3 2027
Latest verified milestone
Structural Frame
Next milestone
Mechanical and Electrical
Starting contribution
₦42.0m
Units available
12

Member-only information

  • Detailed masterplan and boundary data
  • Construction and contractor reports
  • Financial reports and payment progress
  • Meeting decisions and internal announcements
  • Detailed risk register

Private landowner details, sensitive title numbers, member identities, bank details and security-system locations are never published.

Read our trust standards

71 verified members are following this development

Follow this development