18 February 2026 · Site Preparation
Site Clearing Has Begun
Approved contractors began clearing and setting out under supervision of the project surveyor.
82% → 90% verified
Next: Drainage channels and access road formation.

Follow every stage—from the original land and site preparation to infrastructure, construction, finishing and completed homes.
Oke-Ado Family Community
Oke-Ado, Ibadan, Oyo State
Latest verified update: Handover completed and estate management appointed, 2 April 2026.
The story so far
BeforeOriginal land before development.
Captured 28 January 2022
CurrentCompleted and occupied homes.
Inspected 2 April 2026 · Verified by Bola Ajayi, Facility Manager
Future VisionArchitectural VisualisationPhase two concept visualisation (proposed).
Approved Concept Visualisation
This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.
Compare


Architectural Visualisation
This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.
Construction timeline

Stage 1 of 19
Opportunity Identified for this demonstration project, recorded against approved project records.
Planned 15 January 2025 · Completed 15 January 2025
Bola Ajayi, Facility Manager
Masterplan
Land boundary, blocks, roads, drainage, utilities, green areas and community facilities are shown to verified members where publication has been approved.
H-05 · 4-bed detached
4 bedrooms · 290 sqm · Occupied
Contribution from ₦38,000,000 · Estimated completion Completed
H-06 · 4-bed detached
4 bedrooms · 290 sqm · Occupied
Contribution from ₦38,000,000 · Estimated completion Completed
Development gallery
Drone photographOriginal land before development.
Original Land · 28 January 2022 · Uploaded by project administrator · Verification: approved
PhotographCompleted and occupied homes.
Original Land · 2 April 2026 · Uploaded by project administrator · Verification: approved
Architectural renderingPhase two concept visualisation (proposed).
Original Land · Concept · Uploaded by project administrator · Verification: approved
Only approved media is published. Unapproved construction media stays with the project team until a professional reviewer verifies it.
Understand the Land

Satellite and terrain reference
Elevated · Urban
Terrain and environmental information is provided from available project records. Prospective members should review the verified survey, geotechnical, environmental and legal reports before making a commitment.
Infrastructure
Our Community Vision
Community centre
Proposed community feature.
Park
Proposed community feature.
Security
Proposed community feature.
Sports court
Proposed community feature.
Shops
Proposed community feature.
Construction updates

18 February 2026 · Site Preparation
Approved contractors began clearing and setting out under supervision of the project surveyor.
82% → 90% verified
Next: Drainage channels and access road formation.

9 April 2026 · Roads and Drainage
Primary drainage runs excavated and lined along the estate spine road.
90% → 96% verified
Next: Foundation setting out for the first residential block.

2 July 2026 · Occupancy
Independent project manager inspected the works and verified the recorded completion percentage.
96% → 100% verified
Next: Continue approved works programme.
Project progress
Member-only information
Private landowner details, sensitive title numbers, member identities, bank details and security-system locations are never published.
Read our trust standards40 verified members are following this development