Oke-Ado Family Community current site
← Back to the development map
Demonstration ProjectOccupied Community

Watch this community come to life.

Follow every stage—from the original land and site preparation to infrastructure, construction, finishing and completed homes.

Oke-Ado Family Community

Oke-Ado, Ibadan, Oyo State

100%
Verified completion
1652
Days since project start
Completed Q4 2025
Estimated completion
40
Verified members

Latest verified update: Handover completed and estate management appointed, 2 April 2026.

The story so far

Before, current and future vision

Original land before development.Before

Original land before development.

Captured 28 January 2022

Completed and occupied homes.Current

Completed and occupied homes.

Inspected 2 April 2026 · Verified by Bola Ajayi, Facility Manager

Phase two concept visualisation (proposed).Future VisionArchitectural Visualisation

Phase two concept visualisation (proposed).

Approved Concept Visualisation

This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.

Compare

Drag to compare the land over time

Current Progress — 2 April 2026
Original Site — 28 January 2022
Original Site — 28 January 2022Current Progress — 2 April 2026
Approved Concept VisualisationArchitectural Visualisation
Current Progress — 2 April 2026
Current Progress — 2 April 2026Approved Concept Visualisation

This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.

Construction timeline

Every stage, with dates and status

Opportunity Identified illustration

Stage 1 of 19

Opportunity Identified

Opportunity Identified for this demonstration project, recorded against approved project records.

Planned 15 January 2025 · Completed 15 January 2025

Bola Ajayi, Facility Manager

Masterplan

Units, plots and estate layout

H-05H-06Indicative layout — boundaries not published

Land boundary, blocks, roads, drainage, utilities, green areas and community facilities are shown to verified members where publication has been approved.

H-05 · 4-bed detached

4 bedrooms · 290 sqm · Occupied

Completed

Contribution from ₦38,000,000 · Estimated completion Completed

H-06 · 4-bed detached

4 bedrooms · 290 sqm · Occupied

Completed

Contribution from ₦38,000,000 · Estimated completion Completed

Development gallery

Photographs, drone images and renderings

Original land before development.Drone photograph

Original land before development.

Original Land · 28 January 2022 · Uploaded by project administrator · Verification: approved

Completed and occupied homes.Photograph

Completed and occupied homes.

Original Land · 2 April 2026 · Uploaded by project administrator · Verification: approved

Phase two concept visualisation (proposed).Architectural rendering

Phase two concept visualisation (proposed).

Original Land · Concept · Uploaded by project administrator · Verification: approved

Only approved media is published. Unapproved construction media stays with the project team until a professional reviewer verifies it.

Understand the Land

Terrain story

Terrain reference view

Satellite and terrain reference

Elevated · Urban

Terrain classification
Elevated urban land
Elevation summary
Approx. 210–235m above sea level (record)
Slope summary
Terraced during earthworks
Existing vegetation
Landscaped
Access route
Tarred city road
Drainage observations
Engineered and operational
Nearby water bodies
None recorded within 3km
Surrounding land use
Residential
Soil / geotechnical report
Archived
Flood-risk report
Archived
Survey status
Completed and perfected

Terrain and environmental information is provided from available project records. Prospective members should review the verified survey, geotechnical, environmental and legal reports before making a commitment.

Infrastructure

What is being installed on this site

  • Internal roadsOperational
  • DrainageTested
  • Water supplyTested
  • BoreholesInstallation Complete
  • Water treatmentOperational
  • SewageTested
  • ElectricityTested
  • TransformersInstallation Complete
  • Solar energyOperational
  • Street lightingTested
  • CCTVTested
  • Access controlInstallation Complete
  • Internet infrastructureOperational
  • Waste collectionTested
  • Fire protectionTested
  • LandscapingInstallation Complete
  • Community facilitiesOperational

Our Community Vision

The community dream board

Community centre

Proposed community feature.

Park

Proposed community feature.

Security

Proposed community feature.

Sports court

Proposed community feature.

Shops

Proposed community feature.

Construction updates

Verified progress stories

Site Clearing Has Begun

18 February 2026 · Site Preparation

Site Clearing Has Begun

Approved contractors began clearing and setting out under supervision of the project surveyor.

82% → 90% verified

Next: Drainage channels and access road formation.

Drainage Channels Are Taking Shape

9 April 2026 · Roads and Drainage

Drainage Channels Are Taking Shape

Primary drainage runs excavated and lined along the estate spine road.

90% → 96% verified

Next: Foundation setting out for the first residential block.

Occupancy Progress Verified

2 July 2026 · Occupancy

Occupancy Progress Verified

Independent project manager inspected the works and verified the recorded completion percentage.

96% → 100% verified

Next: Continue approved works programme.

Project progress

Where this development stands

Overall development progress100%
Land acquisition100%
Documentation100%
Design100%
Approvals100%
Infrastructure94%
Construction100%
Allocation70%
Handover55%
Original target date
Completed Q4 2025
Current forecast
Completed Q4 2025
Latest verified milestone
Opportunity Identified
Next milestone
Community Formed
Starting contribution
₦38.0m
Units available
0

Member-only information

  • Detailed masterplan and boundary data
  • Construction and contractor reports
  • Financial reports and payment progress
  • Meeting decisions and internal announcements
  • Detailed risk register

Private landowner details, sensitive title numbers, member identities, bank details and security-system locations are never published.

Read our trust standards

40 verified members are following this development

Follow this development