18 February 2026 · Site Preparation
Site Clearing Has Begun
Approved contractors began clearing and setting out under supervision of the project surveyor.
8% → 16% verified
Next: Drainage channels and access road formation.

Follow every stage—from the original land and site preparation to infrastructure, construction, finishing and completed homes.
Epe Greenfields Serviced Plots
Ise Town, Lagos, Lagos State
Latest verified update: Spine road formation completed on 21 June 2026.
The story so far
BeforeOriginal land before clearing.
Captured 30 May 2025
CurrentSite preparation, road formation and drainage excavation.
Inspected 21 June 2026 · Verified by Tunde Bakare, Registered Surveyor
Future VisionArchitectural VisualisationApproved concept visualisation of the serviced estate.
Approved Concept Visualisation
This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.
Compare


Architectural Visualisation
This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.
Construction timeline

Stage 6 of 19
Design for this demonstration project, recorded against approved project records.
Planned 15 November 2025
Tunde Bakare, Registered Surveyor
Masterplan
Land boundary, blocks, roads, drainage, utilities, green areas and community facilities are shown to verified members where publication has been approved.
P-014 · Serviced plot
500 sqm · Site preparation
Contribution from ₦9,500,000 · Estimated completion Q2 2027
P-022 · Serviced plot
500 sqm · Site preparation
Contribution from ₦9,500,000 · Estimated completion Q2 2027
P-041 · Corner plot
650 sqm · Site preparation
Contribution from ₦12,400,000 · Estimated completion Q2 2027
Development gallery
Drone photographOriginal land before clearing.
Original Land · 30 May 2025 · Uploaded by project administrator · Verification: approved
PhotographSite preparation, road formation and drainage excavation.
Original Land · 21 June 2026 · Uploaded by project administrator · Verification: approved
Architectural renderingApproved concept visualisation of the serviced estate.
Original Land · Concept · Uploaded by project administrator · Verification: approved
Only approved media is published. Unapproved construction media stays with the project team until a professional reviewer verifies it.
Understand the Land

Satellite and terrain reference
Flat · Rural · Terrain Report Available
Terrain and environmental information is provided from available project records. Prospective members should review the verified survey, geotechnical, environmental and legal reports before making a commitment.
Infrastructure
Our Community Vision
Estate roads
Proposed community feature.
Perimeter security
Proposed community feature.
Boreholes
Proposed community feature.
Green areas
Proposed community feature.
Playground
Proposed community feature.
Shops
Proposed community feature.
Construction updates

18 February 2026 · Site Preparation
Approved contractors began clearing and setting out under supervision of the project surveyor.
8% → 16% verified
Next: Drainage channels and access road formation.

9 April 2026 · Roads and Drainage
Primary drainage runs excavated and lined along the estate spine road.
16% → 22% verified
Next: Foundation setting out for the first residential block.

2 July 2026 · Site Preparation
Independent project manager inspected the works and verified the recorded completion percentage.
22% → 26% verified
Next: Continue approved works programme.
Project progress
Member-only information
Private landowner details, sensitive title numbers, member identities, bank details and security-system locations are never published.
Read our trust standards132 verified members are following this development