Epe Greenfields Serviced Plots current site
← Back to the development map
Demonstration ProjectLand Preparation

Watch this community come to life.

Follow every stage—from the original land and site preparation to infrastructure, construction, finishing and completed homes.

Epe Greenfields Serviced Plots

Ise Town, Lagos, Lagos State

26%
Verified completion
444
Days since project start
Q2 2027
Estimated completion
132
Verified members

Latest verified update: Spine road formation completed on 21 June 2026.

The story so far

Before, current and future vision

Original land before clearing.Before

Original land before clearing.

Captured 30 May 2025

Site preparation, road formation and drainage excavation.Current

Site preparation, road formation and drainage excavation.

Inspected 21 June 2026 · Verified by Tunde Bakare, Registered Surveyor

Approved concept visualisation of the serviced estate.Future VisionArchitectural Visualisation

Approved concept visualisation of the serviced estate.

Approved Concept Visualisation

This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.

Compare

Drag to compare the land over time

Current Progress — 21 June 2026
Original Site — 30 May 2025
Original Site — 30 May 2025Current Progress — 21 June 2026
Approved Concept VisualisationArchitectural Visualisation
Current Progress — 21 June 2026
Current Progress — 21 June 2026Approved Concept Visualisation

This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.

Construction timeline

Every stage, with dates and status

Design illustration

Stage 6 of 19

Design

Design for this demonstration project, recorded against approved project records.

Planned 15 November 2025

Tunde Bakare, Registered Surveyor

Masterplan

Units, plots and estate layout

P-014P-022P-041Indicative layout — boundaries not published

Land boundary, blocks, roads, drainage, utilities, green areas and community facilities are shown to verified members where publication has been approved.

P-014 · Serviced plot

500 sqm · Site preparation

Available

Contribution from ₦9,500,000 · Estimated completion Q2 2027

P-022 · Serviced plot

500 sqm · Site preparation

Reserved

Contribution from ₦9,500,000 · Estimated completion Q2 2027

P-041 · Corner plot

650 sqm · Site preparation

Available

Contribution from ₦12,400,000 · Estimated completion Q2 2027

Development gallery

Photographs, drone images and renderings

Original land before clearing.Drone photograph

Original land before clearing.

Original Land · 30 May 2025 · Uploaded by project administrator · Verification: approved

Site preparation, road formation and drainage excavation.Photograph

Site preparation, road formation and drainage excavation.

Original Land · 21 June 2026 · Uploaded by project administrator · Verification: approved

Approved concept visualisation of the serviced estate.Architectural rendering

Approved concept visualisation of the serviced estate.

Original Land · Concept · Uploaded by project administrator · Verification: approved

Only approved media is published. Unapproved construction media stays with the project team until a professional reviewer verifies it.

Understand the Land

Terrain story

Terrain reference view

Satellite and terrain reference

Flat · Rural · Terrain Report Available

Terrain classification
Flat rural land
Elevation summary
Approx. 18–24m above sea level (record)
Slope summary
Minimal fall across the site
Existing vegetation
Palm and light bush, partly cleared
Access route
Laterite access track from the expressway
Drainage observations
Perimeter channel proposed in approved design
Nearby water bodies
Lagoon channel approx. 4km south
Surrounding land use
Farmland and emerging estates
Soil / geotechnical report
Available to verified members
Flood-risk report
Commissioned, not yet uploaded
Survey status
Beacons placed, survey plan filed

Terrain and environmental information is provided from available project records. Prospective members should review the verified survey, geotechnical, environmental and legal reports before making a commitment.

Infrastructure

What is being installed on this site

  • Internal roadsInstallation Started
  • DrainageProcurement
  • Water supplyApproved
  • BoreholesApproved
  • Water treatmentInstallation Started
  • SewageProcurement
  • ElectricityApproved
  • TransformersApproved
  • Solar energyInstallation Started
  • Street lightingProcurement
  • CCTVApproved
  • Access controlApproved
  • Internet infrastructureInstallation Started
  • Waste collectionProcurement
  • Fire protectionApproved
  • LandscapingApproved
  • Community facilitiesInstallation Started

Our Community Vision

The community dream board

Estate roads

Proposed community feature.

Perimeter security

Proposed community feature.

Boreholes

Proposed community feature.

Green areas

Proposed community feature.

Playground

Proposed community feature.

Shops

Proposed community feature.

Construction updates

Verified progress stories

Site Clearing Has Begun

18 February 2026 · Site Preparation

Site Clearing Has Begun

Approved contractors began clearing and setting out under supervision of the project surveyor.

8% → 16% verified

Next: Drainage channels and access road formation.

Drainage Channels Are Taking Shape

9 April 2026 · Roads and Drainage

Drainage Channels Are Taking Shape

Primary drainage runs excavated and lined along the estate spine road.

16% → 22% verified

Next: Foundation setting out for the first residential block.

Site Preparation Progress Verified

2 July 2026 · Site Preparation

Site Preparation Progress Verified

Independent project manager inspected the works and verified the recorded completion percentage.

22% → 26% verified

Next: Continue approved works programme.

Project progress

Where this development stands

Overall development progress26%
Land acquisition56%
Documentation50%
Design46%
Approvals41%
Infrastructure20%
Construction26%
Allocation0%
Handover0%
Original target date
Q2 2027
Current forecast
Q2 2027
Latest verified milestone
Survey and Documentation
Next milestone
Government Approval
Starting contribution
₦9.5m
Units available
44

Member-only information

  • Detailed masterplan and boundary data
  • Construction and contractor reports
  • Financial reports and payment progress
  • Meeting decisions and internal announcements
  • Detailed risk register

Private landowner details, sensitive title numbers, member identities, bank details and security-system locations are never published.

Read our trust standards

132 verified members are following this development

Follow this development