Demonstration ProjectFinishing Stage

Watch this community come to life.

Follow every stage—from the original land and site preparation to infrastructure, construction, finishing and completed homes.

Asaba Riverside Duplexes

Okpanam Road, Asaba, Delta State

82%
Verified completion
836
Days since project start
Q1 2027
Estimated completion
41
Verified members

Latest verified update: Internal plastering completed across 24 units, verified 14 July 2026.

The story so far

Before, current and future vision

Original riverside land.Before

Original riverside land.

Captured 2 April 2024

Finishing works across the first two rows.Current

Finishing works across the first two rows.

Inspected 14 July 2026 · Verified by Chika Obi, Quantity Surveyor

Approved concept visualisation of the finished estate.Future VisionArchitectural Visualisation

Approved concept visualisation of the finished estate.

Approved Concept Visualisation

This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.

Compare

Drag to compare the land over time

Current Progress — 14 July 2026
Original Site — 2 April 2024
Original Site — 2 April 2024Current Progress — 14 July 2026
Approved Concept VisualisationArchitectural Visualisation
Current Progress — 14 July 2026
Current Progress — 14 July 2026Approved Concept Visualisation

This image represents the proposed development and may differ from the completed project following approvals, engineering requirements and authorised changes.

Construction timeline

Every stage, with dates and status

Allocation illustration

Stage 17 of 19

Allocation

Allocation for this demonstration project, recorded against approved project records.

Planned 15 September 2027

Chika Obi, Quantity Surveyor

Masterplan

Units, plots and estate layout

D-11D-12D-18Indicative layout — boundaries not published

Land boundary, blocks, roads, drainage, utilities, green areas and community facilities are shown to verified members where publication has been approved.

D-11 · 4-bed duplex

4 bedrooms · 265 sqm · Finishing

Available

Contribution from ₦64,000,000 · Estimated completion Q1 2027

D-12 · 4-bed duplex

4 bedrooms · 265 sqm · Finishing

Allocated

Contribution from ₦64,000,000 · Estimated completion Q1 2027

D-18 · 5-bed duplex

5 bedrooms · 310 sqm · Roofing

Available

Contribution from ₦78,000,000 · Estimated completion Q2 2027

Development gallery

Photographs, drone images and renderings

Original riverside land.Drone photograph

Original riverside land.

Original Land · 2 April 2024 · Uploaded by project administrator · Verification: approved

Finishing works across the first two rows.Photograph

Finishing works across the first two rows.

Original Land · 14 July 2026 · Uploaded by project administrator · Verification: approved

Approved concept visualisation of the finished estate.Architectural rendering

Approved concept visualisation of the finished estate.

Original Land · Concept · Uploaded by project administrator · Verification: approved

Only approved media is published. Unapproved construction media stays with the project team until a professional reviewer verifies it.

Understand the Land

Terrain story

Terrain reference view

Satellite and terrain reference

Gently Sloping · Waterfront · Suburban

Terrain classification
Gently sloping waterfront-adjacent land
Elevation summary
Approx. 40–52m above sea level (record)
Slope summary
Falls gently toward the river corridor
Existing vegetation
Cleared, replanting scheduled
Access route
Paved estate road from Okpanam Road
Drainage observations
Engineered drainage discharging to a lined channel
Nearby water bodies
River corridor approx. 900m west
Surrounding land use
Residential
Soil / geotechnical report
Available to verified members
Flood-risk report
Available to verified members
Survey status
Completed and perfected

Terrain and environmental information is provided from available project records. Prospective members should review the verified survey, geotechnical, environmental and legal reports before making a commitment.

Infrastructure

What is being installed on this site

  • Internal roadsOperational
  • DrainageTested
  • Water supplyInstallation Complete
  • BoreholesInstallation Complete
  • Water treatmentOperational
  • SewageTested
  • ElectricityInstallation Complete
  • TransformersInstallation Complete
  • Solar energyOperational
  • Street lightingTested
  • CCTVInstallation Complete
  • Access controlInstallation Complete
  • Internet infrastructureOperational
  • Waste collectionTested
  • Fire protectionInstallation Complete
  • LandscapingInstallation Complete
  • Community facilitiesOperational

Our Community Vision

The community dream board

Riverside walkway

Proposed community feature.

Community centre

Proposed community feature.

Playground

Proposed community feature.

Solar street lighting

Proposed community feature.

CCTV

Proposed community feature.

Construction updates

Verified progress stories

Site Clearing Has Begun

18 February 2026 · Site Preparation

Site Clearing Has Begun

Approved contractors began clearing and setting out under supervision of the project surveyor.

64% → 72% verified

Next: Drainage channels and access road formation.

Drainage Channels Are Taking Shape

9 April 2026 · Roads and Drainage

Drainage Channels Are Taking Shape

Primary drainage runs excavated and lined along the estate spine road.

72% → 78% verified

Next: Foundation setting out for the first residential block.

Finishing Progress Verified

2 July 2026 · Finishing

Finishing Progress Verified

Independent project manager inspected the works and verified the recorded completion percentage.

78% → 82% verified

Next: Continue approved works programme.

Project progress

Where this development stands

Overall development progress82%
Land acquisition100%
Documentation100%
Design100%
Approvals97%
Infrastructure76%
Construction82%
Allocation52%
Handover37%
Original target date
Q1 2027
Current forecast
Q1 2027
Latest verified milestone
Testing and Inspection
Next milestone
Handover
Starting contribution
₦64.0m
Units available
5

Member-only information

  • Detailed masterplan and boundary data
  • Construction and contractor reports
  • Financial reports and payment progress
  • Meeting decisions and internal announcements
  • Detailed risk register

Private landowner details, sensitive title numbers, member identities, bank details and security-system locations are never published.

Read our trust standards

41 verified members are following this development

Follow this development